--USER REQUIREMENTS
LAN
Network
Security

--LAN
Physical Design
Logical Design
IP Scheme
Router Config
Equipment List
Access Control Lists

--WAN
WAN Design
PPP Config
ISDN Config
Frame Relay



User Requirements

  • 7 to 10 year projected life
    • 100% WAN growth
    • 1000% LAN growth
  • Speed
    • 1 Mbps for workstations
    • 100 Mbps for servers
  • TCP/IP and IPX
  • Frame Relay for WAN transport
  • ISDN for WAN backup connection
  • PPP authentication
  • 2 LANs per room
    • student/curriculum
    • administrative
  • Switched LAN infrastructure
  • Classrooms
    • 25 workstations per classroom
    • 4 cable runs per classroom
    • switches located in locable cabinets
  • File designation is enterprise or workgroup