A renovation project begins on Monday, September 8th in the Newton Gresham Library. A new Fire Protection System will be installed; this requires demolishing ceilings, running new lines, and installing new ceiling tiles. The project will start on the 4th floor and move down to the 1st floor.
How will this impact you? Areas of the Library will be closed from 8:00pm to 7:30am. If you need items from a closed area, ask for assistance at the Circulation Desk. Please bear with us; the project should be completed in two months.